Metro seeking team to prepare for Willamette Falls riverwalk construction

Fri 14 Sep 18

UPDATE: RFP 3590, Design and Planning Services, Willamette Falls Project has been posted on ORPIN.

**************************************************

A search is about to begin for the team to advance the riverwalk at Willamette Falls in downtown Oregon City – envisioned as the catalyst for a signature Oregon destination along the banks of the Willamette River. Metro, one of four public partners of the Willamette Falls Legacy Project, will be issuing a request for proposals this fall to transform a conceptual design for the first phase of the Willamette Falls riverwalk into detailed permitting and construction drawings.

Following years of robust community engagement and stakeholder input, the conceptual Willamette Falls riverwalk design was unveiled last year. The design team, Snøhetta, Mayer/Reed and DIALOG, worked collaboratively to complete the concept for the riverwalk that will connect Oregonians and visitors from afar to Willamette Falls in a way that hasn’t occurred since industrialization began generations ago. This design will carry through all phases of the riverwalk.

Willamette Falls Legacy Project staff submitted riverwalk permit applications to the Army Corps of Engineers, Department of State Lands and National Marine Fisheries Services in May and estimate breaking ground on the first phase of the riverwalk in the spring of 2020.

Phase 1 of the Willamette Falls riverwalk will include safe and secure interim public access onto the former Blue Heron paper mill site, a prominent view of Willamette Falls, habitat restoration along the riverbank and building demolition that will prepare the site for future phases.

The RFP will be posted on the Oregon Procurement Information Network (ORPIN) this fall. You can check here for updates.

If you are interested in learning more, please contact the Willamette Falls Legacy Project at [email protected].

«     »